The Challenge: This project presented a "perfect storm" of physical and political constraints. The site was extremely compromised, as an irregular, undersized plot with a "live" operational facility that restricted regular inspections. Compounding this physical complexity was a volatile approvals landscape: a neighbourhood famous for objecting new developments, and rigorous authority layers threatened to cap the facility’s capacity below operational viability. The risk was a stalled asset caught between physical limitations, project budget and community resistance.

The Intervention: We treated this not as a development project, but as a complex negotiation. We managed the "blind" risks of the active site through forensic planning and active communication. Crucially, we unlocked the planning pathway through direct diplomatic engagement, negotiating face-to-face with neighbors to navigate objections without compromising the asset's function. By rigorously optimising the design against these extreme boundary and budget constraints, we maximised the licensed capacity on a limited footprint.

Our Impact:

  • Stakeholder Consensus: Acted as the diplomatic bridge between operators, Council and neighbours, turning potential conflict into a unified project vision.

  • Community Safeguarding: Managed a sensitive community engagement process, ensuring design approval in a high-objection precinct, with direct and effective negotiations with neighbours.

  • Governance Clarity: Established a bespoke Project Control Group (PCG) structure that shielded the project team from political volatility.

  • Feasibility Rescue: Rigorously value-managed the design phase to manage the budget whilst increasing licensed-places to previous estimates.

  • Site Optimisation: Navigated severe site constraints (e.g., live operations, heritage, tight boundaries) to maximise yield on a compromised footprint.

  • Operational Integration: Embedded Early Learning operators into the design process early, eliminating costly retrofits during construction.